0,5 "/ 12.7mm PC Steel Wire Strand, Relaksasi Rendah Non Rotating Grade 1860/270
0,5 "/12.7mm PC Steel Wire Strand (Non-Rotating) Grade 1860/270
Deskripsi Produk
Ukuran: 12.5, 12.7, 12.9, 15.2, 15.7, 17.8mm
Standar: ASTM A416-2006, ASTM A910-2005, ABNT NBR 7483: 2008, AS 1311 (Australia), AS / NZS 4672.1, BS5896-1980, EN10138-3, GB / T5224-2003, IS6006-1983, JISG3536, KSD7002, UNE36094-97 (Spanyol), NEN3868
Tanggal teknis
Untai Baja Tanpa Lapisan 7-Kawat untuk Beton Pratekan sesuai ASTM A 416
Min.Breaking Strength | Nominal | Dia. | Norminal | Bobot Nominal | Min. | Min.Load | Min. Perpanjangan | 0,7 usus |
MPA | mm | mm | Mm2 | Kg / Km | KN | KN | % | % |
1860 | 9.53 | | 54.84 | 432 | 102.3 | 92.1 | | |
11.11 | 74.19 | 582 | 137.9 | 124.1 | ||||
12.70 | 98.7 | 775 | 183.7 | 165.3 | ||||
15.24 | 140.0 | 1102 | 260.7 | 234.6 | ||||
17.80 | 190.0 | 1492 | 353.0 | 318.0 | ||||
2000 | 12.70 | + 0,66, -0,15 | 98.7 | 775 | 197.4 | 177.7 | ≥3.5 | ≤2.5 |
15.24 | 140.0 | 1102 | 280.0 | 252.0 |
Untai Baja Tanpa Lapisan 7-Kawat untuk Beton Pratekan sesuai GB / T5224
Min.Breaking Strength | Nominal | Dia. | Norminal | Bobot Nominal | Min. | Min.Load | Min. Perpanjangan | 0,7 usus |
MPA | mm | mm | Mm2 | Kg / Km | KN | KN | % | % |
1860 | 9.50 | + 0,30, -0,15 | 54.8 | 432 | 102 | 86.6 | | |
11.10 | 74.2 | 580 | 138 | 117 | ||||
12.70 | | 98.7 | 775 | 184 | 156 | |||
15.20 | 140 | 1101 | 259 | 220 | ||||
15.70 | 150 | 1178 | 279 | 251 | ||||
17.80 | 191 | 1500 | 353 | 318 | ||||
1960 | 12.70 | + 0,40, -0,20 | 98.7 | 775 | 193 | 174 | ≥3.5 | ≤2.5 |
15.20 | 140 | 1101 | 274 | 247 |
Penggunaan:
Baja pra-tekan berlaku untuk struktur beton pasca-tegangan dan pra-tekan pada proyek-proyek teknik sipil, konstruksi bangunan dan infrastruktur berikut: jembatan;bantalan rel kereta api, papan lintasan kereta bawah tanah;Bandara;bangunan industri, bangunan komersial, pondasi perumahan tempat tinggal;Tiang PC, tiang pancang, balok, gelagar, pelat, papan T ganda, papan lantai berlubang, lantai, geladak parkir, PHC, PPCP;tenaga listrik, pembangkit listrik tenaga nuklir;pelabuhan, bendungan, proyek air, pengolahan limbah, kolam renang;penahan kumparan batu, stabilisasi lereng samping, tambang kumparan;tangki penyimpanan untuk gas nasional, minyak, biji-bijian;stadion, menara TV dll.
Memuat: